Before you start

You'll need:

  • Your gate kit (gate modules, connecting bars, wall mount panels and adhesive tape)

  • Shellite, from the Bunnings paint department

  • A clean, lint-free cloth

  • A spirit level (optional)

Your tape: your kit includes the right 3M VHB tape for your surfaces. Green is for plasterboard, red is for glass.

Installation

1. Assemble the gate
Join the modules to match the layout photos we emailed you. The ratchet joints let you set each angle.

2. Lock the modules together
Push each connecting bar firmly up into the cone fitting, then seat the bottom in the recess. The spring in the cone keeps the gate rigid.

3. Attach the wall mount panels
Clip the wall mount panels onto the plastic brackets on each end of the gate. (The gate-side brackets come already fitted.)

4. Check the fit
Stand the gate in place and make sure the size and layout are right before fixing anything.

5. Clean the surfaces
Wipe the wall or glass where each panel will sit, using plenty of Shellite on a cloth. This is the most important step: a clean surface gives a strong bond.

⚠️ Safety: Shellite is highly flammable. Keep it away from naked flames and use it in a well-ventilated area.

6. Fix the first panel
Position the gate with the panel about 1cm from the wall. Peel the backing off the tape and press the panel into place. Use a spirit level if you like, but a degree or two off won't matter.

7. Press hard
Press the panel as firmly as you can for a solid bond. On glass, support the glass from behind while you press.

8. Fix the second panel
Repeat steps 6 and 7 on the other side.

9. Let it set
Avoid leaning on or pushing the gate for the first 24 hours. The tape keeps building strength and reaches full strength after about 3 days.

Why it holds: the rigid bracket and large bonded area give the strength. In our impact testing, the plastic brackets break before the panel lets go.

Need help?

If anything isn't clear, we're happy to help. Email info@homesafekids.com.au and we'll get back to you promptly.